My attempt to make a 1MV VDG
Pages and links will be added here as the construction continues.
Theory
Construction
- Topload manufacture
- Frame Construction
- Rollers Combs and Drive
- Speed Control (coming soon)
- Belt construction
Progress
Topload almost done, needs finishing. Needs inner radius’s.
Frame, Done
Rollers Complete and mounted. Drive needs variable speed control.
Belt Done, needs aligning with rollers to keep it central.
Results