1Mv Van De Graff project

My attempt to make a 1MV VDG

 

Pages and links will be added here as the construction continues.

Theory

Van De Graff Theory

Construction

  1. Topload manufacture
  2. Frame Construction
  3. Rollers Combs and Drive
  4. Speed Control (coming soon)
  5. Belt construction

Progress

Topload almost done, needs finishing. Needs inner radius’s.
Frame, Done
Rollers Complete and mounted. Drive needs variable speed control.
Belt Done, needs aligning with rollers to keep it central.

1MV Van de Graff

Results

Success 1MV DC!!